Alternating cooling bins
The two-way diverter directed dryer discharge to either cooling bin.
Moose Jaw area / Dryers & farm setups
Bucket elevator installation, two cooling bins and a blower system.
Explore 35 photos
The setup connected wet-grain handling, a dryer, two cooling bins and pneumatic transfer to storage. A custom actuated two-way diverter allowed the cooling bins to alternate between filling and cooling.
The two-way diverter directed dryer discharge to either cooling bin.
Augers supplied the blower system after cooling, connecting the bins to the storage transfer route.
Elevator sections, under-bin equipment and custom connections were fitted around the bin arrangement.
The photo collection
Open any photo to enlarge it. Use the arrows to browse, or zoom in to inspect the details.



































Planning & Quoting for Spring 2027
Bring us in before you buy the equipment. Let’s talk through the layout, connections and installation.