Grain handling · Installation · Repairs

Selected field work / On-site fabrication

On-site fabrication & fit-up.

Transitions, supports and equipment modifications from several installations.

Explore 16 photos
Field fabrication and welding around installed equipment
Field fabrication and welding around installed equipment

The work.

These photographs bring together on-site fabrication and fit-up from several jobs. They show the smaller pieces that connect an installation: supports, chutes, transitions and modifications around existing equipment.

A collection of Richard’s field work across multiple projects.

01 / THE DETAILS

Measure at the equipment

Field measurements help account for the connections and clearances actually on site.

02 / THE DETAILS

Fit the missing pieces

Fabricated components connect equipment and adapt it to the surrounding structure.

The photo collection

Take a closer look.

Open any photo to enlarge it. Use the arrows to browse, or zoom in to inspect the details.

Field fabrication and welding around installed equipment
01Field fabrication and welding around installed equipment
Field fabrication and welding around installed equipment
02Field fabrication and welding around installed equipment
Field fabrication and welding around installed equipment
03Field fabrication and welding around installed equipment
Fabricated transition fitted to existing equipment
04Fabricated transition fitted to existing equipment
Fabricated transition fitted to existing equipment
05Fabricated transition fitted to existing equipment
Fabricated transition fitted to existing equipment
06Fabricated transition fitted to existing equipment
Steel supports fitted around a roof opening
07Steel supports fitted around a roof opening
Steel supports fitted around a roof opening
08Steel supports fitted around a roof opening
Steel supports fitted around a roof opening
09Steel supports fitted around a roof opening
Steel supports fitted around a roof opening
10Steel supports fitted around a roof opening
Flanged pipe connection prepared for fit-up
11Flanged pipe connection prepared for fit-up
Two-way diverter and grain-transfer connections
12Two-way diverter and grain-transfer connections
Two-way diverter and grain-transfer connections
13Two-way diverter and grain-transfer connections
Two-way diverter and grain-transfer connections
14Two-way diverter and grain-transfer connections
Fold-down table frames in the lowered position
15Fold-down table frames in the lowered position
Fold-down table frames folded against the wall
16Fold-down table frames folded against the wall
16 photos

Planning & Quoting for Spring 2027

Something like this
for your setup?

Bring us in before you buy the equipment. Let’s talk through the layout, connections and installation.

Discuss a similar project