Set out the pipe runs
Elevations and elbow positions were measured before fitting the connections.
Melfort area / Conveyors & grain legs
Blower equipment, a six-way valve and aligned piping along an existing bin row.
Explore 8 photos
The installation began with ground preparation and patio-block bases for the blower equipment and distribution valve. Pipe runs were then laid out along the bins, with laser measurements used to establish where the elbows would meet each bin.
Elevations and elbow positions were measured before fitting the connections.
Careful alignment minimized gaps between pipe sections—an important detail where abrasive grain passes through banded joints.
The photo collection
Open any photo to enlarge it. Use the arrows to browse, or zoom in to inspect the details.