Grain handling · Installation · Repairs

Central Butte area / Upgrades & repairs

Wooden leg. Steel replacement.

A steel bucket elevator, raised roof and overhead conveying for an existing wooden elevator.

Explore 22 photos
Steel replacement leg above the raised elevator roof
Steel replacement leg above the raised elevator roof

The work.

Replacing a wooden grain leg meant working through the existing building, not simply standing a new leg beside it. The work included removing the old roof, wooden leg and distributor-platform floor, then fitting a new boot and steel elevator. The roof was raised approximately 10 feet, with the new leg extending above it to serve three exterior bins.

Richard’s project experience from 2019, before establishing 306 Mechanical.

01 / THE DETAILS

Working within the building

The old distributor floor and wooden leg were removed to make room for the replacement equipment.

02 / THE DETAILS

A new route for grain

The steel leg and overhead conveyor connected the existing elevator to three exterior bins.

03 / THE DETAILS

Roof and access

New walls raised the roof around the replacement leg, with exterior platforms providing equipment access.

The photo collection

Take a closer look.

Open any photo to enlarge it. Use the arrows to browse, or zoom in to inspect the details.

Steel replacement leg above the raised elevator roof
01Steel replacement leg above the raised elevator roof
Original timber structure and distributor-platform area
02Original timber structure and distributor-platform area
Original timber structure and distributor-platform area
03Original timber structure and distributor-platform area
Original timber structure and distributor-platform area
04Original timber structure and distributor-platform area
Original timber structure and distributor-platform area
05Original timber structure and distributor-platform area
Roof and wooden leg removal work
06Roof and wooden leg removal work
Roof and wooden leg removal work
07Roof and wooden leg removal work
Roof and wooden leg removal work
08Roof and wooden leg removal work
Steel elevator section being lifted
09Steel elevator section being lifted
Replacement steel trunking through the floor opening
10Replacement steel trunking through the floor opening
Replacement steel trunking through the floor opening
11Replacement steel trunking through the floor opening
Replacement steel trunking through the floor opening
12Replacement steel trunking through the floor opening
Steel grain leg fitted inside the existing building
13Steel grain leg fitted inside the existing building
Steel grain leg fitted inside the existing building
14Steel grain leg fitted inside the existing building
Steel grain leg fitted inside the existing building
15Steel grain leg fitted inside the existing building
Steel grain leg fitted inside the existing building
16Steel grain leg fitted inside the existing building
Steel grain leg fitted inside the existing building
17Steel grain leg fitted inside the existing building
Exterior access platform and grain-handling connections
18Exterior access platform and grain-handling connections
Exterior access platform and grain-handling connections
19Exterior access platform and grain-handling connections
Exterior access platform and grain-handling connections
20Exterior access platform and grain-handling connections
Steel bucket elevator head and access platform
21Steel bucket elevator head and access platform
Steel replacement leg above the raised elevator roof
22Steel replacement leg above the raised elevator roof
22 photos